Unitized can offer performance.
Unitized curtain wall vs stick system.
Unitized systems are fully assembled in the factory and installation being done on site with the help of cranage facilities benefiting from.
In cases where the wall configuration seems as complex and having more corners and drastic changes in the plane the stick system would be more economical.
On the average smaller projects tend to make more sense for stick curtain wall since the lead times are shorter and there are less expensive prefabbed pieces.
This is mostly adopted in low rise and mid rise buildings.
Unitised curtain walls and stick built systems are the two main classifications of curtain wall systems.
The curtain wall construction is classified as two as stick system and unitized system.
For larger projects in major cities unitized is now more or less the standard.
Unitized systems can be economically friendly shifting labor expense from field to factory.
On the other hand stick built curtain walls are installed piece by piece.
For a standard curtain wall in a typical all glazed building the borderline sits somewhere between 3 000 and 5 000 m2.
Less than 3 000 m2 go for stick.
High speed installation reduced field installation costs by maintaining high quality control with very minimum on site manpower.
The fabrication process for unitized systems is more consistent than for stick built curtain walls as unitized wall systems are constructed in almost an assembly line fashion indoors and under controlled environmental conditions.
Curtain walls are classified by their method of fabrication and installation in two categories.
In this system most of the erection and fabrication are done at the site.
The entire fenestration system essentially locks together providing excellent protection against high wind loads and earthquakes.
Unitised systems are made of large units and erected on the building facade.
There is too little space to develop a.
In other words the differences mainly lie in their method of installation.
Unitized curtain wall systems are comprised of large units that are assembled and glazed in the factory.
Stick systems are installed on site with the frame sequence followed by glazing and are being placed on scaffolding or cradle facilities where you require more manpower on site than unitized glazing.
They are then shipped to the job site and erected on the building façade.
Offers a detailed description of stick built and unitized curtain walls including system types thermal performance characteristics acoustic and aesthetic features and.