8250xd unitized curtain wall system 11 21 2019 page 4 section 1.
Unitized curtain wall system installation pdf.
Ycu 750 tu unitized curtain wall system page 10 04 4013 00 effective date.
Since unitized curtain walls are the current state of the art in curtain wall technology designers consultants and contractors alike need to become familiar with these systems technical limitations so that we can develop effective designs that address their use for all areas of the building enclosure.
Long pieces of aluminum hence the name stick are inserted between floors vertically and horizontally between vertical members to support and transfer the load of the glass back to structure.
If your project doesn t suit most of the criteria for a unitized system your other option is to use a stick built system.
Safely and swiftly you can expect our highly methodized system to follow through on its shipping promise.
March 18 2016 installation notes 1.
Here the reynaers aluminium cw 65 ef unitized façade system is employed to great effect.
Possible installation solution standard element installation detail of standard bracket functionalities.
System information curtain wall 65 element façade is a cost efficient curtain wall system for element façades with.
Plan details slab anchor.
Plan details vision spandrel.
A desire for speed of.
General notes and guidelines f.
Move and stack boxes with proper support to prevent distortion.
If fork lifts are used be especially careful about striking the boxes when lifting or moving.
Hence it is essential to keep in mind the mode of transportation and installation while planning the depth of facade.
Sealant all sealant must meet astm c 920 class 50.
Individual installation of each component are not necessary as in sticky curtain wall system.
Shipping facility ensures timely delivery of products.
Do not drop roll or drag boxes of aluminum framing.
The size of the unitized curtain walls are dependent on the floor to floor height of the building.
All aluminum anchors and aluminum components of the curtainwall system must be separated from the structural steel and concrete with a nylon separator or material of similar compatibility.
April 22 2010 unit installation step 4 install l anchor note.
To install fire insulation according to approved shop drawing at top part of concrete beam surface prior to curtain wall installation.
For the purposes of these instructions sealant is to be defined as the following.